Plan the work
Walk the route
- Measure gates, overhead clearance, slopes, soft ground, pavement edges, and the path to the work area.
- Flag people, vehicles, structures, and overhead lines.
Locate what is buried
- Request utility locating before excavation or ground disturbance.
- Mark known drains, irrigation, septic, foundations, and shallow services.
Set the work and safety boundary
- State what the operator moves, where material ends up, who loads/hauls it, and who keeps people outside the machine’s travel and swing area.
