Plan the work
Check the substrate
- Note concrete, wood subfloor, existing finish, dips, squeaks, and any history of water.
- Moisture testing should follow the product and method requirements.
Condition product and space
- Conditioning or acclimation is not a fixed number of days.
- The floor, building, and current indoor environment need to meet the flooring manufacturer’s instructions.
Resolve edges and movement
- Agree on board direction, starter line, expansion allowance, thresholds, transitions, trim, and which door or cabinet clearances may be affected.